How to Prepare a Technical Brief for Custom Industrial Equipment
Published: October 22, 2026
8 min read
- Start with the production task, not the mechanism
- Describe the product, material and full parameter range
- How to specify output and result quality
- What to include in a custom equipment specification
- Footprint, utilities, safety and project boundaries
- Checklist before contacting an equipment engineer
A technical brief for custom equipment does not have to begin as a long document written by the customer’s engineering team. At the initial stage, it is more important to describe the production process, the current problem, the product, the expected result and the known constraints clearly.
A weak brief often describes only a preferred solution: “we need a conveyor,” “use a pneumatic cylinder” or “build a machine for 100 units per minute.” Without product data, feeding conditions, acceptable scrap, available space, operator interaction and adjacent equipment, those statements are not enough to define the real engineering task.
A useful technical brief defines the problem, required function and acceptance criteria before prescribing the final mechanism.
Start with the production task, not the mechanism
Before describing the future machine, record how the process works today. The engineer needs to understand where time is lost, where output becomes unstable, which actions overload the operator and how defects or unsafe situations occur.
Describe:
- the operation currently performed manually or by existing equipment;
- what is unsatisfactory about the current process;
- the result the new equipment must provide;
- the upstream and downstream stages;
- the operator’s current actions;
- recurring errors, downtime and hazards;
- whether the project replaces a machine, adds one unit or creates a new production area.
“Lift a bag and discharge the product into a hopper” is a more useful requirement than “build a hydraulic tipper.” The first statement defines the function and allows several concepts to be compared. The second prescribes a design before the load, cycle and operating conditions are understood.
When the working principle is not yet defined, the task begins with engineering design and manufacturing documentation: the concept is developed first, followed by the detailed assemblies and drawings.
Describe the product, material and full parameter range
Custom equipment does not handle an abstract “product.” It interacts with a specific workpiece, material, package or bulk product. Its physical properties may determine the method of gripping, feeding, locating, cutting, dosing or conveying.
The brief should include:
- the product or workpiece name and function;
- minimum, nominal and maximum dimensions;
- unit weight and possible variation;
- material, hardness, moisture, temperature or fragility where relevant;
- shape and orientation during feeding;
- whether scratches, dents, deformation or lubricant contact are acceptable;
- variation between batches;
- photographs, video, samples and available drawings.
Do not provide only one ideal size. When the machine must handle several formats, the engineer needs the complete range and the expected changeover frequency.
Bulk, food, wet, hot or abrasive materials require additional information such as bulk density, particle size, sticking tendency, dust, cleaning requirements and compatibility of product-contact surfaces.
How to specify output and result quality
Required output must be connected to the real operating cycle. “100 units per minute” is not sufficient when it is unclear whether this is a short peak speed, stable shift output or performance including stops, cleaning and changeovers.
Include:
- required units per minute, hour or shift;
- operating pattern: one shift, multiple shifts or intermittent use;
- target cycle time and product-feeding time;
- acceptable changeover time for another format;
- required upstream and downstream accumulation;
- acceptable stops and restart procedure;
- measurable quality characteristics of the result.
Quality criteria should be measurable. Instead of “cut evenly,” specify length tolerance, edge condition and acceptable scrap. Instead of “dose accurately,” define target weight and tolerance. Instead of “do not damage the product,” identify the defects that make the result unacceptable.
Acceptance should be separated into testing before shipment and testing after installation where both stages are included. FAT verifies the equipment at the manufacturer’s site in the agreed configuration. SAT verifies operation at the customer’s facility with actual utilities, adjacent equipment and the real production process. The brief should state which tests belong to each stage.
- Define the nominal mode used during normal production.
- State the desired maximum output separately.
- Describe acceptable and unacceptable results.
- Define the product, test duration and FAT conditions.
- Confirm whether SAT is required after installation.
- State who supplies products, raw material, operators and utilities for testing.
What to include in a custom equipment specification
The table helps verify that the main groups of input data have been covered.
| Brief section | Information to include | Why engineering needs it |
|---|---|---|
| Production task | Current process, problem and expected result | To select a working principle rather than copy an arbitrary design |
| Product or workpiece | Dimensions, weight, material, condition and variation | For gripping, feeding, locating and load calculations |
| Output | Nominal cycle, peak speed and shift pattern | For drives, buffering and operating logic |
| Result quality | Tolerances, defects, accuracy and acceptable scrap | To establish measurable acceptance criteria |
| Operator | Loading, controls, changeover and staffing | For ergonomics, access and practical operation |
| Installation area | Footprint, access, height, floor and installation route | To ensure the equipment fits and can be serviced |
| Utilities | Power, compressed air, water, extraction and network connections | For compatibility with the facility infrastructure |
| Integration | Adjacent machines, feed heights, signals and product direction | For coordinated operation within the line |
| Safety and life cycle | Known hazards, operating modes, cleaning, service and disposal | For risk assessment and safe access throughout the equipment life cycle |
| Supply scope | Equipment, documentation, software, installation, training and spares | To avoid different interpretations of the project boundary |
| Acceptance | FAT, SAT, test product, operating mode, metrics and procedure | For objective verification of the agreed result |
Footprint, utilities, safety and project boundaries
A technically sound machine is not suitable if it cannot be brought into the building, positioned beside the existing line, connected to available utilities or cleaned and serviced safely.
Add the following to the brief:
- a layout or sketch of the available area;
- maximum equipment footprint and height;
- door, gate and installation-route dimensions;
- floor characteristics and allowable loading where critical;
- available electrical power and voltage;
- compressed-air pressure and consumption;
- water, extraction, ventilation and network availability;
- feed height and direction from adjacent equipment;
- required start, stop, ready and fault signals;
- access areas for cleaning, repair and consumable replacement.
The customer should describe known hazardous situations such as manual loading, hot surfaces, dust, sharp tools, trapping points, rotating parts and entry into the working area during cleaning or setup. However, a requested list of guards does not replace risk assessment during design. Protective measures must be selected after reviewing normal operation, setup, cleaning, maintenance and reasonably foreseeable misuse.
When the task includes sensors, controllers, drives and signal exchange, describe operating logic, access rights, recipe storage and behaviour after faults or power loss. This helps determine whether the project involves mechanising one operation or broader production process automation.
Define the supply package separately: mechanical equipment, electrical hardware, control cabinet, software, drawings, diagrams, manuals, spare-parts list, training, installation and commissioning. State the destination country and industry where these affect documentation and conformity requirements.
Also agree who prepares foundations, supplies utilities and third-party units, participates in FAT/SAT and provides the product for testing. For complete implementation, this is linked to equipment installation and commissioning.
Checklist before contacting an equipment engineer
You do not need to design the complete machine or prepare a formal specification running to dozens of pages. For the initial discussion, collect factual information about the process.
- Describe the operation that should be performed or improved.
- Record the current process in photographs or video.
- Provide samples, drawings or product parameters.
- State minimum and maximum dimensions and weight.
- Define nominal output and operating pattern.
- Describe measurable result-quality criteria.
- Show the available footprint, utilities and adjacent equipment.
- Explain operator actions, cleaning, changeover and maintenance.
- Identify known hazards and special environmental conditions.
- Define the required supply package and documentation.
- State whether FAT before shipment and SAT after installation are required.
- Describe how and with which product acceptance testing should be performed.
These inputs help determine whether the task requires one mechanism, an automated unit or full custom industrial equipment development.
The technical brief is not an unchangeable record of the first idea. After analysis, some requirements may be clarified, separated into mandatory and desirable items, or adjusted where they conflict. Before detailed design begins, the function, project boundary, key risks, required deliverables and acceptance criteria should be agreed clearly.